Projects
Track openings and developments before they hit the street.
UDO TA 21-01 Change All Special Use Districts to Conditional Zoning Districts
UDO TA-21-01 Changing all Special Use Zoning Districts (SUD) to Conditional Zoning Districts (CZ).
Main Street Grant Project Status
In 2020, Rolesville was awarded over $4.8m from the Capital Area Metropolitan Planning Organization (CAMPO) to realign the Burlington Mills Road intersection with Main Street, and make streetscape improvements, improve crosswalks, install new curb and gutter, sidewalks, and bicycle transportation enhancements from Burlington Mills Road to Young Street. This…
Public Works Facility - 805 E. Young St.
The Town of Rolesville is constructing an operations center for the Public Works Department at 805 E. Young Street,. Voluntary Annexation Annexation of 15.221 acres into Town Limits. On February 1, 2022, the Town Board conducted a joint Public Hearing for and as Agenda Item C.1; the Board voted Unanimously (5-0) on a motion to Approve the Voluntary…
Averette & Jones Dairy Mixed Use
Granite Falls Blvd Ext
CD 21-06 Granite Falls Blvd Ext - Continuing a section of Granite Falls Blvd
4325 Burlington Mills
Minor Final Plat to subdivide 4325 Burlington Mills Road, into three (3) new lots intended for single-family detached residential development. as.
Wynstan
A neighborhood with large homesites
N Arendell multifamily
A multifamily residential site plan was detected near N Arendell Avenue. Unit count and timeline still need verification.
Old Bunn Road Subdivision Planned Development
Proposal of a subdivision providing a variety of products and lot sizes for single-family detached homes and a variety of single-family attached homes, street tree landscaping, storm-water conveyance and storm water control structures, public sanitary sewer and water utilities, sidewalks throughout, and greenways with amenity areas for subdivision residents.
WCC Building 5A
Construction Documents have been submitted for 2 industrial buildings in the first phase of Wendell Exchange PUD.
King Tide Holdings
Zebulon Family Fare commercial project in Zebulon (A Proposed) at 609 W Gannon Ave.
Zaxby's
Construction Drawings are in review for a new Zaxby's restaurant.
Wawa
Wawa commercial project in Zebulon (A Proposed) at 1300 N Arendell Ave.
Self Service Storage - Conditional Rezoning
Self Service Storage - Conditional Rezoning commercial project in Zebulon (Pending Board Action) at 0 Old US 264 Hwy.
Wendy's
Wendy's commercial project in Zebulon (A Proposed) at 1500 N Arendell Ave.
PNC Bank
Construction Drawings are in review for a PNC Bank in Wendell Falls.
Wendell Falls Collective HQ
Construction Documents have been submitted for several commercial/industrial flex buildings in the Wendell Falls Collective.
Planet Fitness
Construction Documents have been submitted for a new Planet Fitness.
Glennon Medical Office
Construction Documents have been submitted for a medical office building in the Glennon Mixed-Use Development
Glennon Commercial 2
Construction Documents are in review for a multi-tenant building featuring restaurants, retail and other commercial uses.
Don’t miss what’s coming.
Get East Wake openings and development updates by email.
