Projects
Track openings and developments before they hit the street.
Wendell Village
SUP has been approved and preliminary plans have been submitted for 140 townhomes and 42 single family homes at Wendell Village.
Wendell Falls Lot 18 Senior Living Apartments
Construction Documents for a 140 unit senior apartment building have been submitted and are under reiview.
Wendell Station
Construction Drawings are in review for this 113-unit townhome community.
Martin Street Townhomes
Construction Drawings are in review for 6 townhomes close to Downtown.
Railside
Conditional District Master Plan was approved for 8 townhome units close to Downtown.
Eagle Rock Townhomes
Construction Documents have been submitted for a residential community featuring 150 townhomes.
Old Tarboro Townhomes
Conditional District Master Plan has been approved for 127 Townhome community.
Martin Pond Road Subdivision
Master Plan was approved for a residential community featuring 340 single family homes and 179 Townhomes.
Pineapple Sol at Wallbrook
Second Triangle location for the Cary halal café — 10-year lease at Wallbrook; suite and opening date not yet public.
Chapel Hill Tire at Wallbrook
Chapel Hill Tire planned for Wallbrook Lot 8B at 633 S. Main St. — site plan under town review.
PNC Bank at Wallbrook
PNC Bank planned for Wallbrook Lot 9B at 810 S. Main St. — site plan under town review.
Drayton Reserve
Drayton Estates - Rezoning Conditions of Approval signed/dated 2006-03-30 Subdivision records for this residential neighborhood. Phase II (2) Construction Drawings dated 2014-08-07 _ Signed approval 2014-10-14. Preliminary Subdivision Plat with a revision date 2007-02-10 Phase 1A Recorded 2009-07-13 as BM2009_Pg764-775 Phase 1B Recorded on 2013-03-20 as…
Watkins Farm Subdivision
Watkins Farm is a single-family detached residential subdivision of 37 Lots. Per the Final Plat Note #1, building setback lines are established as 30' Front / 12' Side / 25' Rear. Note 3 stipulated minimum lot size of 40,000 Square feet with Note 2 stipulating a 75' minimum lot width line. There are several Notes that speak to 'public sewer': Note 7 -…
Sanford Creek Interceptor Sewer
A sanitary sewer main line within the Sanford Creek in the vicinity of the Town of Rolesville and the Town of Wake Forest.
Carlton Pointe
Atticus Woods (fka Wait Avenue - 2028, 2200, 2206, 2216, 2232)
Atticus Woods - formerly known by the addresses of the 5 tracts of land comprising the property, being 2028, 2200, 2206, 2216, 2232 Wait Avenue and being PIN's 1860045788, 1860056400, 1860151206, 1860143789, 1850950449 and under common ownership under two different business names (WFINV, LLC and Thales Academy). Zoning Map Amendment…
Zebulon Village
Grocery-anchored retail center planned for northern Zebulon, positioned near growing residential neighborhoods.
901 E Young Street / Gravity
Preliminary Subdivision Plat - Preliminary subdivision of 20.19 acres into Six (6) non-residential lots for a commercial shopping center development. 5 development lots, 1 lot for Stormwater Control Measure, right-of-way dedication along existing E Young and Quarry Roads. Three (3) submittals reviewed by TRC Staff between August 2025…
302 S Main St - Learning Experience Rolesville
302 S. Main Street - Development of a child day care center (The Learning Experience).
Stonewater subdivision
Uploaded is the Wake County Watershed Management Construction Plan Approval letter dated 10/20/2017. This references 'S&E Permit number S5656" and 'SW Permit number S5658'.
Don’t miss what’s coming.
Get East Wake openings and development updates by email.
